Hydroelectric projects
| Name of the Project | Installed Capacity MW |
Energy Potential MU |
Major Works Started in |
Original Estimate in Rs. lakhs |
Latest Estimate in Rs. lakhs |
Remarks |
| Azhutha Diversion, Idukki | 57 | 1987 | 290 | 1446 | Partially Commissioned | |
| Malankara, Idukki | 10.50 | 65 | 1987 | 780 | 4113 | Commissioned. |
| Kuttiadi Tail Race, Kozhikode | 3.75 | 15 | 1989 | 397 | 1494 | Work nearing completion |
| Vazhikkadavu Diversion, Idukki | 24 | 1989 | 186 | 1599 | Commissioned. | |
| Kuttiadi Additional Extension | 100 | 240.5 | 2000 | 220.50 | 16828 | To be completed by 2008 |
| Bhoothathankettu, Ernakulam | 16 | 61.5 | 1994 | 3283 |
Private Sector |
|
| Ullungal | 7 | 34 | Private Sector | |||
| Karikkayam | 15 | 72.7 | 1994 | 3860 | Private Sectpr |
|
| Kuttiyar Diversion | 37 | 1991 | 214 | 949 | To be completed by 2008 | |
| Kuttiyadi Diversion (Augmentation) | 223 | 1305 | 19300 |
Commissioned-- Dec. 2005 | ||
| Sengulam Augmentation | 85 | 2001 | ||||
| Thottiyar | 40 |
99 |
20704 | Preliminary works started | ||
| Athirappally | 163 | 386 | 2001 | 10254 |
31590 |
EIA became controversial |
| Vadakkepuzha Diversion | 12 | 131 |
514 | Commissioned | ||
| Chempukadavu Stage I & II | 6.45 | 15.63 | 2001 | 1654 |
2410 | Commissioned |
| Urumi Stage 1 & 2 | 6.15 | 16 | 2001 | 1415 |
Completed/Chinese assistance | |
| Neriamangalam Extension | 25 | 58.27 |
2003 | 3506 | 4776 | Completed |
| Sengulam Tail Race | 3.60 |
12.57 |
Steps taken to start work | |||
| Lower Meenmutty | 3.5 |
9.9 | 2003 |
495 | 1238 | Commissioned |
| Mankulam | 40 | 82 | Preliminary works started | |||
| Pallivasal Extension | 60 | 164.87 |
17500 |
17586 |
To be completed in 2011 |
|
| Adayanpara |
3.5 |
9.01 |
2007 |
2132 |
2132 | To be completed in 2009 |
| Barapol I & II |
25 | 60 | ||||
| Chalippuzha | 90 | Project Report ready | ||||
| Thoovalar | 4 | Project Report ready | ||||
| Alamparathodu | 3 | Project Report ready | ||||
| Sabarigiri Additional Capacity | 35 | 154.51 | 94.64 | Renovation of Sabarigiri Project | ||
| Kakkadam Poyil 1 | 20 | 55 |
On the drawing board | |||
| Kakkadam Poyil 2 |
5 |
11 |
On the drawing board | |||
| Anackam Poyil |
7.50 |
22,63 |
On the drawing board | |||
| Kandappanchal |
5 |
On the drawing board | ||||
| Pathamkayom |
4 |
On the drawing board | ||||
| Olickal |
3.2 |
On the drawing board | ||||
| Chathankottu Nada 2 |
6 |
14.76 |
On the drawing board | |||
| Vilangadu |
7.5 |
22.63 |
On the drawing board | |||
| Maniyar Tail Race |
4 |
16 |
On the drawing board | |||
| Perunthenaruvi |
10 |
25.77 |
On the drawing board | |||
| Marumala |
5 |
On the drawing board | ||||
| Pathrakadavu, Silent Valley | 70 | 214 | 24706 | EIA became controversial | ||
| Poozhithodu |
4.80 |
10.97 |
||||
| Achankovil |
30 |
75.80 |
||||
| Chinnar |
28 |
82.09 |
Thermal Projects (Private Sector)
| Name of the Project | Installed Capacity MW | Energy Potential (MU) |
Remarks |
| DCP, Kasaragod | 105 | 749 |
Work under way |
| Kannur Power Corporation | 513 | Work to be started | |
| SASIN, Kochi | 679 | Work to be started | |
| Cochin Refineries, Ambalamugal | 621 | Joint Sector |
Besides the above, the State Electricity Board is planning some mini hydroelectric schemes such as Poovaramthodu (2MW) and Pasukadavu (2 MW). Some small hydroelectric units are being constructed with Chinese collaboration. Besides, 62 small projects are proposed for private investment. Palakkad district panchayat is implementing Meenvallom project (2.4 MW).
The State E;lectricity Board proposes to
complete 34 small projects including Neriamangalam extension and
Kuttiyadi tail race before 2011. They will add installed capacity of
about 200 MW (558.819 MU).
5MW wind farm at Ramackalmedu (15 MU) is proposed to be taken up in the private sector during the current Plan period.