HOME

Kerala at a Glance
Power Projects
Plan Outlay
Demand
Consumption
Average Tariffs
Source of Funds
Ongoing Works

Kerala Power System at a Glance - 2000
Installed Capacity -M.W. 
Maximum Demand -M.W. 
a) System (Unrestricted)
b) Restricted through Load Shedding 
Generation Per Annum-M.U. 
Import Per Annum -M.U. 
Export Per Annum - M.U. 
Energy Sales Per Annum-M.U. 
Energy losses (as percentage 
of energy available for sales) 
Per capita Consumption- Kwh 
No of Generating Stations
220 K.V. Lines- Circuit Km 
110 K.V. Lines- Circuit Km 
66 K.V. Lines- Circuit Km 
11 K.V Lines- Circuit Km 
LT. Lines- Circuit Km 
Step up Transformer Capacity -MVA 
No. of EHT Sub Stations 
Step down Transformer Capacity -MVA 
Distribution- Transformer 
a) Numbers 
b) Capacity - MVA 
No. of Villages Electrified 
No. of consumers (in lakhs) 
Connected Load -M.W. 
No. of Street lights 
No. of Irrigation Pumps 
Total Revenue per Annum (Rs. Lakhs) 
2391.18 
  
2330.00 
2177.00 
  7655.57 
4275.04 
 0.00 
 9812.88 
 17.41 
   
300.58 
22^ 
1954.73 
 2910.93 
 2733.31 
 28672.00 
 180499.00 
 2808.37 
 179 
 8773.40* 
 .   
29638 
 3864.12 
 1384 (all) 
 60.30 
 8150.00 
 716390 
 354722* 
 166765.08 
  *. Figures on step down transformers and irrigation pumps pertain to  1999. Other entries are as on March 31, 2000.
The entire 1999 figures are avaialble  in the archives
^ The Kanjicode Wind Farm produced no power in 1999-2000.
Roy's Home Page: