Installed Capacity -M.W.
Maximum Demand -M.W.
a) System (Unrestricted)
b) Restricted through Load Shedding
Generation Per Annum-M.U.
Import Per Annum -M.U.
Export Per Annum - M.U.
Energy Sales Per Annum-M.U.
Energy losses (as percentage of energy available for sales)
Per capita Consumption- Kwh
No of Generating Stations
220 K.V. Lines- Circuit Km
110 K.V. Lines- Circuit Km
66 K.V. Lines- Circuit Km
11 K.V Lines- Circuit Km
LT. Lines- Circuit Km
Step up Transformer Capacity -MVA
No. of EHT Sub Stations
Step down Transformer Capacity -MVA
Distribution- Transformer
a) Numbers
b) Capacity - MVA
No. of Villages Electrified (all)
No. of consumers (in lakhs)
Connected Load -M.W.
No. of Street lights
No. of Irrigation Pumps
Total Revenue per Annum (Rs. Lakhs) (from sale of power)
|